Sign in
5YRSLA MIEUX PRODUCTS, LTD.

公司概览

公司相册

基础信息

产品容量

生产流程

Low-Pressure Molding
1. Get samples from customer. 2. Molding design 3. Select appropriate material and molding. 4. Feasibility test 5. Mass production

工厂信息

厂房面积
Below 1,000 square meters
工厂位置
Room 106, Building 3, No. 600, Guangshan Second Road, Tianhe District, Guangzhou City, Guangdong Province, 510520 (Kimang Park, Tianhe Software Park)
生产线数量
3
合同制造
OEM Service Offered, Design Service Offered
年产值
US$2.5 Million - US$5 Million

质量控制

质量管理过程

hardness testing
1. making a 5mm thickness specimen. 2. testing hardness under shore A hardness tester
dimensional measurement equipment
1. testing from different angle if the molds or parts after molding are in spec.
tensile strength testing
1. making 4mm x 4 mm x 20mm specimen. 2. testing tensile strength under the machine.